top of page

Oceanvale by Meriton

Comprehensive Facade Restoration 

At Evolution Abseilers, we are in the final stages of completing a full-scale remedial and maintenance project at Oceanvale Apartments for Meriton, ensuring long-lasting repairs and improvements with minimal disruption to residents.

WhatsApp Image 2024-09-18 at 10.01.08.jpeg

Project Scope & Key Works 

Using rope access, we carried out: 

  • Concrete repairs to restore structural integrity and prevent further deterioration. 

  • Facade maintenance, ensuring the building’s exterior remains in top condition. 

  • Waterproofing to enhance durability and protect against future leaks. 

  • Full external repainting using a high-performance membrane system for superior weather resistance

_DSC2029.jpg

Advanced Access & Rigging Techniques 

To safely and efficiently access all areas of the 17-building complex, we implemented: 

  • Lubbers handling up to 80kg, supported by tripods and advanced rigging techniques for secure material transport. 

  • Tension lines to enhance maneuverability in challenging areas. 

  • Spider EWP (Elevated Work Platform) for sections requiring additional reach and precision. 

WhatsApp Image 2025-02-10 at 14.44.50 (1).jpeg

Smart Project Management & Reporting 

Our team leverages a cloud-based project management system to track progress, report in real time, and ensure seamless coordination between teams and stakeholders. This system allows us to efficiently document remedial work, maintain transparency, and streamline communication throughout the project. With detailed visual reporting and progress tracking, we ensure that every phase of the restoration meets the highest standards. 

Screenshot 2025-03-05 at 2.48.25 pm.png

Specialized Remedial Works 

Our skilled team of 12 professionals carried out: 

  • Render repairs to damaged surfaces. 

  • Replacement of Sikaflex caulking with backer rods for expansion joints. 

  • Crack treatment to prevent water ingress and structural issues. 

  • Concrete cancer repairs to stop further degradation and ensure longevity.

WhatsApp Image 2025-02-10 at 15.39.12.jpeg

Project Timeline & Outcome 

  • 1-year project – final building in progress 

  • 17 buildings restored 

  • Enhanced durability, waterproofing, and aesthetics 

  • By combining rope access expertise, advanced rigging techniques, and industry-leading remedial solutions, Evolution Abseilers has played a key role in delivering a high-quality restoration of Oceanvale Apartments, ensuring structural longevity and a refreshed modern appearance. 

_DSC1900.jpg
bottom of page